RERA project
ARIHANTCITY PHASE-I - D3 - BUILDING
ARIHANT CITY PHASE-I - D3 - BUILDING is a new Commercial project located at Bhiwandi, Thane. Registred under RERA on 16th October 2019, the project aims to deliver 207 apartments by 30th December 2025. With 136 units already booked, the project boasts a remarkable booking percentage of 65.7%. Situated on prime land comprising CTS numbers 116/1P, 116/2P, 118/7, 118/9, 118/11P, 119/1P, 119/2P, 119/4, and 119/8P, the project is strategically positioned on Kalyan Bhiwandi Road, Bhiwandi. Pincode 421302 makes it easily accessible. A perfect blend of comfort, luxury, and convenience, ARIHANT CITY PHASE-I - D3 - BUILDING is poised to become the most sought-after Commercial destination in Bhiwandi.
Possession overdue — verify OC/CC on MahaRERA
RERA timeline
Registered: 2019-10-16
Possession due: 2025-12-30
Promoter last activity: 2026-08-14
Possession timeline
- Registered16 Oct 2019
- Proposed completion30 Dec 2025
- Today (IST) — possession date has passed3 Nov 2026
Project registry facts
- RERA number
- P51700022743
- Promoter
- Arihant Enterprises
- Promoter type
- Partnership
- Brand
- Arihant Enterprises
- Status
- Active Project
- Type
- Residential
- Registration date
- 2019-10-16
- Proposed completion
- 2025-12-30
- Survey / CTS
- 116/1P 116/2P 118/7 118/9 118/11P 119/1P 119/1P 119/2P 119/2P 119/4 119/8P
- Price per sq ft
- ₹6,800 - ₹12,700
- Construction progress
- 48% across 11 recorded stages
Inventory
- Apartments
- 207
- Booked
- 6
- Sold
- 140
- Unsold
- 61
- Percent booked
- 2.9
Location
- Locality
- BHIWANDI
- City / district
- Thane
- Taluka
- Bhiwandi
- Village
- Bhiwandi (M Corp.)
- Street
- KALYAN BHIWANDI ROAD
- PIN
- 421302
- Plot area (sqm)
- 3415
- Sanctioned FSI area (sqm)
- 7683.75
- Proposed built-up area (sqm)
- 7683.75
- Total FSI
- 7683.75
- Parking
- 376
- Coordinates
- 0.000000000000, 0.000000000000
About this project
Experience luxury living at its finest with ARIHANTCITY PHASE-I - D3 - BUILDING, a premier Commercial project located in the heart of Bhiwandi (M Corp.), Thane. Developed by ARIHANT ENTERPRISES, a reputed name in the industry, this project sprawls over a vast area of 3415 sqmts and boasts of 207 apartments, with 65.7% already booked. The project, registered under RERA no. P51700022743, offers a unique blend of modern amenities and comfortable living spaces, with a completion deadline of 30/12/2025. Strategically situated near ADJ S NO 118-12, the project enjoys close proximity to key amenities and attractions, making it an attractive option for homebuyers and investors alike. With a sanctioned FSI of 7683.75 sqmts, the project features a thoughtfully designed layout, ensuring maximum space utilization and a pleasant living experience. Invest in ARIHANTCITY PHASE-I - D3 - BUILDING and reap the benefits of a lucrative real estate opportunity in one of Thane's most sought-after locations.
Project information
ARIHANT CITY PHASE-I - D3 - BUILDING is a new Commercial project located at Bhiwandi, Thane. Registred under RERA on 16th October 2019, the project aims to deliver 207 apartments by 30th December 2025. With 136 units already booked, the project boasts a remarkable booking percentage of 65.7%. Situated on prime land comprising CTS numbers 116/1P, 116/2P, 118/7, 118/9, 118/11P, 119/1P, 119/2P, 119/4, and 119/8P, the project is strategically positioned on Kalyan Bhiwandi Road, Bhiwandi. Pincode 421302 makes it easily accessible. A perfect blend of comfort, luxury, and convenience, ARIHANT CITY PHASE-I - D3 - BUILDING is poised to become the most sought-after Commercial destination in Bhiwandi.
Configurations & carpet areas
| # | Floor Type | Total No. of Booked | Total No. of Mortgage | Total No. of Sold Units | Total No. of Rehab Units | Total No. of Reservation | Total No. of Unsold Units | Total Apartments / Unit (NR+R) | Total No. Of Residential Apartments/ Units | Identification of Wing as per Sanctioned Plan | Total No. Of Non-Residential Apartments/ Units | Total No. of Land Owner/ Investor Share (For Sale) | Total No. of Land Owner/ Investor Share (Not For Sale) | Identification of Building/ Wing as per Sanctioned Plan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Habitable Floor | 6 | 0 | 140 | 0 | 0 | 61 | 207 | 195 | — | 12 | 0 | 0 | D-3 BUILDING |
Building details
| # | view | file name | document type | uploaded date | cc issued up-to (no. of floors) | sanctioned apartments / unit (nr+r) | identification of wing as per sanctioned plan | total no. of building sanctioned habitable floor | identification of building/ wing as per sanctioned plan | number of sanctioned floors (including basement+ stilt+ podium+ service+ habitable excluding terrace) | floor type | total no. of booked | total no. of mortgage | total no. of sold units | total no. of rehab units |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | — | PROJECT TITLE REPORT - 2017.pdf | 1 Copy of the legal title report | 9/10/2019, 12:55 PM | — | — | — | — | — | — | — | — | — | — | — |
| 2 | — | ENCUMBRANCE LETTER D-3 BUILDING.pdf | 1 Details of encumbrances | 9/10/2019, 12:55 PM | — | — | — | — | — | — | — | — | — | — | — |
| 3 | — | D-3 ENCUMBRANCES 25-02-2021.pdf | 2 Details of encumbrances | 25/02/2021, 6:35 PM | — | — | — | — | — | — | — | — | — | — | — |
| 4 | — | SANCTIONED LAYOUT PLAN 01062019.pdf | 1 Copy of Layout Approval (in case of layout) | 9/10/2019, 12:58 PM | — | — | — | — | — | — | — | — | — | — | — |
| 5 | — | D3 SANCTIONED PLAN 25112021.pdf | 2 Copy of Layout Approval (in case of layout) | 15/12/2021, 2:40 PM | — | — | — | — | — | — | — | — | — | — | — |
| 6 | — | NA 13052008.pdf | 1 Building Plan Approval / NA Order for plotted development | 9/10/2019, 1:01 PM | — | — | — | — | — | — | — | — | — | — | — |
| 7 | — | NA 26082011.pdf | 2 Building Plan Approval / NA Order for plotted development | 9/10/2019, 1:01 PM | — | — | — | — | — | — | — | — | — | — | — |
| 8 | — | NA 23052014.pdf | 3 Building Plan Approval / NA Order for plotted development | 9/10/2019, 1:02 PM | — | — | — | — | — | — | — | — | — | — | — |
| 9 | — | CC 01062019.pdf | 1 Commencement Certificates / NA Order for plotted development | 9/10/2019, 1:03 PM | — | — | — | — | — | — | — | — | — | — | — |
| 10 | — | PHASE I CC 25112021.pdf | 2 Commencement Certificates / NA Order for plotted development | 15/12/2021, 2:40 PM | — | — | — | — | — | — | — | — | — | — | — |
| 11 | — | MAR-21 RERA DISCLOSURE - D-3.pdf | 1 Declaration about Commencement Certificate | 28/09/2021, 2:44 PM | — | — | — | — | — | — | — | — | — | — | — |
| 12 | — | FORMAT D PHASE-I.pdf | 2 Declaration about Commencement Certificate | 15/12/2021, 2:34 PM | — | — | — | — | — | — | — | — | — | — | — |
| 13 | — | FORM B PHASE-I.pdf | 1 Declaration in FORM B | 9/10/2019, 1:08 PM | — | — | — | — | — | — | — | — | — | — | — |
| 14 | — | ARCHITECT CERTIFICATE D-3 BUILDING.pdf | 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 9/10/2019, 1:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 15 | — | DEC-19 ARCH-CERT - D-3.pdf | 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 17/01/2020, 12:53 PM | — | — | — | — | — | — | — | — | — | — | — |
| 16 | — | MAR-20 ARCH-CERT - D-3.pdf | 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 13/07/2020, 11:42 AM | — | — | — | — | — | — | — | — | — | — | — |
| 17 | — | JUN-20 ARCH-CERT - D-3.pdf | 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 13/07/2020, 11:42 AM | — | — | — | — | — | — | — | — | — | — | — |
| 18 | — | SEP-20 ARCH-CERT - D-3.pdf | 5 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 6/05/2021, 12:28 PM | — | — | — | — | — | — | — | — | — | — | — |
| 19 | — | DEC-20 ARCH-CERT - D3.pdf | 6 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 19/06/2021, 12:25 PM | — | — | — | — | — | — | — | — | — | — | — |
| 20 | — | MAR-21 ARCH-CERT - D-3.pdf | 7 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 28/09/2021, 2:37 PM | — | — | — | — | — | — | — | — | — | — | — |
| 21 | — | JUN-21 ARCH-CERT - D-3.pdf | 8 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 16/12/2021, 5:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 22 | — | SEP-21 ARCH-CERT - D-3.pdf | 9 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 25/04/2022, 4:53 PM | — | — | — | — | — | — | — | — | — | — | — |
| 23 | — | DEC-21 ARCH-CERT - D-3.pdf | 10 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 9/07/2022, 1:45 PM | — | — | — | — | — | — | — | — | — | — | — |
| 24 | — | MAR-22 ARCH-CERT - D-3.pdf | 11 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 6/09/2022, 2:49 PM | — | — | — | — | — | — | — | — | — | — | — |
| 25 | — | JUN-22 ARCH-CERT - D-3.pdf | 12 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 7/02/2023, 5:38 PM | — | — | — | — | — | — | — | — | — | — | — |
| 26 | — | SEP-22 ARCH-CERT - D-3.pdf | 13 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 7/02/2023, 5:40 PM | — | — | — | — | — | — | — | — | — | — | — |
| 27 | — | DEC-22 ARCH-CERT - D-3.pdf | 14 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 7/02/2023, 5:40 PM | — | — | — | — | — | — | — | — | — | — | — |
| 28 | — | Form 1 March 23 D3 Building.pdf | 15 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 22/04/2023, 2:19 PM | — | — | — | — | — | — | — | — | — | — | — |
| 29 | — | JUN-23 ARCH-CERT - D3.pdf | 16 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 20/07/2023, 2:25 PM | — | — | — | — | — | — | — | — | — | — | — |
| 30 | — | SEP-23 ARCH-CERT - D3.pdf | 17 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 2/11/2023, 1:52 PM | — | — | — | — | — | — | — | — | — | — | — |
| 31 | — | DEC-23 ARCH-CERT - D-3.pdf | 18 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 31/01/2024, 12:12 PM | — | — | — | — | — | — | — | — | — | — | — |
| 32 | — | MAR-24 ARCH-CERT - D3.pdf | 19 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 4/05/2024, 6:01 PM | — | — | — | — | — | — | — | — | — | — | — |
| 33 | — | JUN-24 ARCH-CERT - D-3.pdf | 20 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 12/07/2024, 5:46 PM | — | — | — | — | — | — | — | — | — | — | — |
| 34 | — | ENGINEER CERTIFICATE D-3 BUILDING.pdf | 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 9/10/2019, 1:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 35 | — | DEC-19 ENGG-CERT - D-3.pdf | 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 7/02/2020, 12:55 PM | — | — | — | — | — | — | — | — | — | — | — |
| 36 | — | JUN-20 ENGG-CERT - D-3.pdf | 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 25/07/2020, 12:22 PM | — | — | — | — | — | — | — | — | — | — | — |
| 37 | — | MAR-20 ENGG-CERT - D-3.pdf | 4 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 27/07/2020, 2:11 PM | — | — | — | — | — | — | — | — | — | — | — |
| 38 | — | SEP-20 ENGG-CERT - D-3.pdf | 5 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 6/05/2021, 12:28 PM | — | — | — | — | — | — | — | — | — | — | — |
| 39 | — | DEC-20 ENGG-CERT - D-3.pdf | 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 19/06/2021, 12:25 PM | — | — | — | — | — | — | — | — | — | — | — |
| 40 | — | MAR-21 ENGG-CERT - D-3.pdf | 7 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 28/09/2021, 2:37 PM | — | — | — | — | — | — | — | — | — | — | — |
| 41 | — | JUN-21 ENGG-CERT - D-3.pdf | 8 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 16/12/2021, 5:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 42 | — | SEP-21 ENGG-CERT - D-3.pdf | 9 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 25/04/2022, 4:54 PM | — | — | — | — | — | — | — | — | — | — | — |
| 43 | — | DEC-21 ENGG-CERT - D-3.pdf | 10 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 9/07/2022, 1:46 PM | — | — | — | — | — | — | — | — | — | — | — |
| 44 | — | MAR-22 ENGG-CERT - D-3.pdf | 11 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 6/09/2022, 3:56 PM | — | — | — | — | — | — | — | — | — | — | — |
| 45 | — | JUN-22 ARCH-CERT - D-3.pdf | 12 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 7/02/2023, 5:41 PM | — | — | — | — | — | — | — | — | — | — | — |
| 46 | — | JUN-22 ENGG-CERT - D-3.pdf | 13 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 7/02/2023, 5:41 PM | — | — | — | — | — | — | — | — | — | — | — |
| 47 | — | SEP-22 ENGG-CERT - D-3.pdf | 14 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 7/02/2023, 5:42 PM | — | — | — | — | — | — | — | — | — | — | — |
| 48 | — | D3 Building Dec 22 Form 2.pdf | 15 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 10/02/2023, 5:33 PM | — | — | — | — | — | — | — | — | — | — | — |
| 49 | — | Form 2 March 23 Building - D3.pdf | 16 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 7/08/2023, 8:01 PM | — | — | — | — | — | — | — | — | — | — | — |
| 50 | — | Engineer Certificate March 2020 D3 Building.pdf | 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) | 13/07/2021, 6:34 PM | — | — | — | — | — | — | — | — | — | — | — |
Construction progress
| stage | completion_percent |
|---|---|
| 1 | 100 |
| 2 | 100 |
| 3 | 25 |
| 4 | 100 |
| 5 | 50 |
| 6 | 70 |
| 7 | 35 |
| 8 | 0 |
| 9 | 52 |
| 10 | 0 |
| 11 | 0 |
Location & boundaries
This RERA registered project is situated in the picturesque village of Bhiwandi, Thane district. The project is bounded by the Eastern side of Survey No. 119-7, Western side of Survey No. 118-12, Northern side of 60 M Wide D.P. Road, and Southern side of Survey No. 119-7. The project covers multiple Survey Numbers, including 116/1P, 116/2P, 118/7, 118/9, 118/11P, 119/1P, 119/1P, 119/2P, 119/2P, 119/4, and 119/8P. The project's prime location in Bhiwandi offers an ideal blend of accessibility, convenience, and tranquility.
Project professionals
| Serial No | Professional Name | Professional Type |
|---|---|---|
| 1 | AKRUTI CONSULTANT | Architect |
| 2 | TECHLINE | Engineer |
| 3 | BAIJU JHOHN | Engineer |
| 4 | PRIYA SANJAY JAIN | Chartered Accountant |
| 5 | ATMS & CO LLP | Chartered Accountant |
| 6 | P B G & ASSOCIATES | Chartered Accountant |
| 7 | MADRECHA & COMPANY | Chartered Accountant |
| 8 | SANTOSH PARDESI | Other |
Litigation
- Status
- No
Map
Project photos

FAQs
What makes arihantcity phase-i - d3 - building in thane a great place to live?
arihantcity phase-i - d3 - building in thane offers a balanced mix of urban amenities and rural charm. With access to local schools, markets, and transportation, it is an ideal place for both families and professionals. The surrounding area provides natural beauty, making it a peaceful yet well-connected locality.
Where is the arihantcity phase-i - d3 - building project located?
The arihantcity phase-i - d3 - building project is located in bhiwandi , Thane, maharashtra. It is situated in a serene environment with easy access to major roads and surrounding areas.
How many apartments are available in the this project?
There are a total of 207 apartments in the project approved by Maharera, providing a comfortable living space for its residents
What is the total area of the arihantcity phase-i - d3 - building project?
The total project area for arihantcity phase-i - d3 - building is 3415.0 square meters. This expansive space offers plenty of room for Commercial plots and recreational areas.
What recreational space is available as per FSI?
The project offers 685.0 square meters of recreational space as per FSI, providing ample room for parks, sports, and leisure activities for residents.
Who is the developer behind the arihantcity phase-i - d3 - building project?
The project is developed by arihant enterprises, a well-known name in the real estate industry. They are a trusted developer, offering quality and timely delivery of Commercial and commercial spaces. The developer is registered under credai - mchi (credai - maharashtra chamber of housing industry), ensuring compliance with industry standards and regulations.
What bank is associated with the project?
DCB BANK LTD is associated with the arihantcity phase-i - d3 - building project. For home loan and financing options, ICICI Bank provides reliable services with IFSC Code DCBL0000018.
Developer — Arihant Enterprises
Established as a reputable partnership entity, ARIHANT ENTERPRISES is a prominent player in the real estate industry, headquartered in Khopat, Thane, Maharashtra. With a robust presence in the region, we bring forth innovative and premium Commercial and commercial projects that redefine luxury living. Our affiliation with CREDAI - MCHI (CREDAI - Maharashtra Chamber of Housing Industry) underscores our commitment to adhering to industry best practices. As a valued customer, you can trust our partnership entity with DCB Bank Ltd, having an IFSC code of DCBL0000018. Our dedicated team looks forward to collaborating with you.
Compliance snapshot
- Scrape source
- maharera-scraper-webmaster
- Scrape version
- 2026.07.11
- Last developer update on filing
- 14 Aug 2026
- Registered on
- 16 Oct 2019
- Last verified
- 30 Aug 2026
Enquire now
For project records and related property information, use the GeoSquare dashboard.