VISHWA RAM-SNEH
Nagala Park, Kolhapur · Patki-Joshi Engineers And Contractors Pvt. Ltd.
**Vishwa Ram-Sneh Commercial Project** Located in the vibrant city of Kolhapur, Maharashtra, Vishwa Ram-Sneh is a Commercial project that promises to redefine luxury living. Approved by the RERA authority on 25th August 2022, this project is scheduled for completion by 30th June 2025. The project boasts 24 apartments, of which 12 have already been booked, reflecting a remarkable 50% sale. Strategically situated at Plot No. 35, C.S. No. 249/A/1/27/A/1, Nagala Park, Kolhapur, this project offers an exclusive address and a serene living experience amidst nature.
Total units
26
Booked
0%
Plot area
1264.77 sqm
RERA timeline
- Registered25 Aug 2022
- Possession due30 Jun 2025
- Promoter last activity7 Dec 2023
Possession timeline
IST · filed dates only
- Registered25 Aug 2022
- Proposed completion30 Jun 2025
- Today (IST)20 Nov 2026
About this project
Experience luxury living at its finest with VISHWA RAM-SNEH, a premier Commercial project located in the heart of Kolhapur (M Corp.), Kolhapur. Developed by Patki-Joshi Engineers and Contractors Pvt. Ltd., a reputed name in the industry, this project sprawls over a vast area of 1264.77 sqmts and boasts of 24 apartments, with 50% already booked. The project, registered under RERA no. P53000046648, offers a unique blend of modern amenities and comfortable living spaces, with a completion deadline of 30/06/2025. Strategically situated near 12 Meter Road, the project enjoys close proximity to key amenities and attractions, making it an attractive option for homebuyers and investors alike. With a sanctioned FSI of 4654.11 sqmts, the project features a thoughtfully designed layout, ensuring maximum space utilization and a pleasant living experience. Invest in VISHWA RAM-SNEH and reap the benefits of a lucrative real estate opportunity in one of Kolhapur's most sought-after locations.
Project information
**Vishwa Ram-Sneh Commercial Project**
Located in the vibrant city of Kolhapur, Maharashtra, Vishwa Ram-Sneh is a Commercial project that promises to redefine luxury living. Approved by the RERA authority on 25th August 2022, this project is scheduled for completion by 30th June 2025. The project boasts 24 apartments, of which 12 have already been booked, reflecting a remarkable 50% sale. Strategically situated at Plot No. 35, C.S. No. 249/A/1/27/A/1, Nagala Park, Kolhapur, this project offers an exclusive address and a serene living experience amidst nature.
Configurations & carpet areas
From Maharashtra RERA apartment summary filings.
| # | Floor Type | Total No. of Booked | Total No. of Mortgage | Total No. of Sold Units | Total No. of Rehab Units | Total No. of Reservation | Total No. of Unsold Units | Total Apartments / Unit (NR+R) | Total No. Of Residential Apartments/ Units | Identification of Wing as per Sanctioned Plan | Total No. Of Non-Residential Apartments/ Units | Total No. of Land Owner/ Investor Share (For Sale) | Total No. of Land Owner/ Investor Share (Not For Sale) | Identification of Building/ Wing as per Sanctioned Plan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Habitable Floor | 0 | 0 | 18 | 0 | 0 | 8 | 26 | 16 | — | 10 | 0 | 0 | VISHWA RAM-SNEH |
Project registry facts
RERA
P53000046648
Promoter
Patki-Joshi Engineers And Contractors Pvt. Ltd.
Status
Completed Project
Type
Mixed / other use
Registration
25 Aug 2022
Completion
30 Jun 2025
Survey / CTS
Plot No. 35 out of C.S.No. 249/A/1/27/A/1
Construction progress
89% across 11 recorded stages
Apartments
26
Booked units
0
Key facts
- RERA number
- P53000046648
- Promoter
- Patki-Joshi Engineers And Contractors Pvt. Ltd.
- Promoter type
- Company
- Status
- Completed Project
- Type
- Mixed / other use
- Registration date
- 2022-08-25
- Proposed completion
- 2025-06-30
- Survey / CTS
- Plot No. 35 out of C.S.No. 249/A/1/27/A/1
- Construction progress
- 89% across 11 recorded stages
18 sold · 0 booked · 8 unsold · 26 total
Booked 0 of 26 units · 0%
Inventory
- Apartments
- 26
- Booked
- 0
- Sold
- 18
- Unsold
- 8
Location
- Locality
- Nagala Park
- City / district
- Kolhapur
- Taluka
- Karvir
- Village
- Kolhapur (M Corp.)
- Street
- E ward Nagala Park
- PIN
- 416003
- Plot area (sqm)
- 1264.77
- Sanctioned FSI area (sqm)
- 3204.11
- Proposed built-up area (sqm)
- 3204.11
- Total FSI
- 4654.11
- Parking
- 783
- Coordinates
- 16.709461666311, 74.238196154631
Building details
| # | view | file name | document type | uploaded date | cc issued up-to (no. of floors) | sanctioned apartments / unit (nr+r) | identification of wing as per sanctioned plan | total no. of building sanctioned habitable floor | identification of building/ wing as per sanctioned plan | number of sanctioned floors (including basement+ stilt+ podium+ service+ habitable excluding terrace) | floor type | total no. of booked | total no. of mortgage | total no. of sold units | total no. of rehab units |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | — | Legal Title and Search Report.pdf | 1 Copy of the legal title report | 22/07/2022, 5:24 PM | — | — | — | — | — | — | — | — | — | — | — |
| 2 | — | Encumbrance Concerned to Finance.pdf | 1 a Details of encumbrances concerned to Finance | 22/07/2022, 5:26 PM | — | — | — | — | — | — | — | — | — | — | — |
| 3 | — | Encumbrance Concerned to Legal.pdf | 1 b Details of encumbrances concerned to Legal | 22/07/2022, 5:26 PM | — | — | — | — | — | — | — | — | — | — | — |
| 4 | — | Layout Final.pdf | 1 Copy of Layout Approval (in case of layout) | 8/07/2022, 4:44 PM | — | — | — | — | — | — | — | — | — | — | — |
| 5 | — | Sanctioned Plan 1 new.pdf | 1 Building Plan Approval / NA Order for plotted development | 22/07/2022, 5:29 PM | — | — | — | — | — | — | — | — | — | — | — |
| 6 | — | Sanctioned Plan 2 New.pdf | 2 Building Plan Approval / NA Order for plotted development | 22/07/2022, 5:29 PM | — | — | — | — | — | — | — | — | — | — | — |
| 7 | — | Sanctioned Plan 3 New.pdf | 3 Building Plan Approval / NA Order for plotted development | 22/07/2022, 5:29 PM | — | — | — | — | — | — | — | — | — | — | — |
| 8 | — | Sheet-1 (1).pdf | 4 Building Plan Approval / NA Order for plotted development | 27/04/2023, 12:10 PM | — | — | — | — | — | — | — | — | — | — | — |
| 9 | — | Sheet-2 (1).pdf | 5 Building Plan Approval / NA Order for plotted development | 27/04/2023, 12:10 PM | — | — | — | — | — | — | — | — | — | — | — |
| 10 | — | Sheet-3 (1).pdf | 6 Building Plan Approval / NA Order for plotted development | 27/04/2023, 12:11 PM | — | — | — | — | — | — | — | — | — | — | — |
| 11 | — | Sheet-4 (1).pdf | 7 Building Plan Approval / NA Order for plotted development | 27/04/2023, 12:11 PM | — | — | — | — | — | — | — | — | — | — | — |
| 12 | — | Commencement Certificate.pdf | 1 Commencement Certificates / NA Order for plotted development | 1/07/2022, 3:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 13 | — | Revised Permission (1).pdf | 2 Commencement Certificates / NA Order for plotted development | 27/04/2023, 12:11 PM | — | — | — | — | — | — | — | — | — | — | — |
| 14 | — | Declaration about CC.pdf | 1 Declaration about Commencement Certificate | 23/07/2022, 11:52 AM | — | — | — | — | — | — | — | — | — | — | — |
| 15 | — | Form B Declaration.pdf | 1 Declaration in FORM B | 22/07/2022, 5:26 PM | — | — | — | — | — | — | — | — | — | — | — |
| 16 | — | Architect Certificate07212022.pdf | 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 22/07/2022, 5:26 PM | — | — | — | — | — | — | — | — | — | — | — |
| 17 | — | Form 1 -Patki joshi vishwa ram Sneh12262022.pdf | 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 26/12/2022, 5:59 PM | — | — | — | — | — | — | — | — | — | — | — |
| 18 | — | Form 1 (4).pdf | 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 27/04/2023, 12:12 PM | — | — | — | — | — | — | — | — | — | — | — |
| 19 | — | Form 1 (5).pdf | 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 8/08/2023, 1:36 PM | — | — | — | — | — | — | — | — | — | — | — |
| 20 | — | Architect Certificate.pdf | 5 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 5/10/2023, 1:31 PM | — | — | — | — | — | — | — | — | — | — | — |
| 21 | — | Form-1.pdf | 6 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 6/01/2024, 5:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 22 | — | Form-1.pdf | 7 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 6/01/2024, 5:15 PM | — | — | — | — | — | — | — | — | — | — | — |
| 23 | — | Form 1.pdf | 8 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 19/04/2024, 12:57 PM | — | — | — | — | — | — | — | — | — | — | — |
| 24 | — | Form 1.pdf | 9 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 19/04/2024, 12:57 PM | — | — | — | — | — | — | — | — | — | — | — |
| 25 | — | FORM 1 PATKI.pdf | 10 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 4/05/2024, 2:15 PM | — | — | — | — | — | — | — | — | — | — | — |
| 26 | — | Form 1.pdf | 11 Architect’s Certificate of Percentage of Completion of Work (Form 1) | 18/07/2024, 1:55 PM | — | — | — | — | — | — | — | — | — | — | — |
| 27 | — | Engineer Certificate.pdf | 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 1/07/2022, 3:24 PM | — | — | — | — | — | — | — | — | — | — | — |
| 28 | — | Form 2 -2022-202310052023.pdf | 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 5/10/2023, 1:32 PM | — | — | — | — | — | — | — | — | — | — | — |
| 29 | — | Engineer Certificate10052023.pdf | 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 5/10/2023, 1:39 PM | — | — | — | — | — | — | — | — | — | — | — |
| 30 | — | Form-2 (1).pdf | 4 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 6/01/2024, 5:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 31 | — | Form 2.pdf | 5 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 19/04/2024, 12:57 PM | — | — | — | — | — | — | — | — | — | — | — |
| 32 | — | Form 2.pdf | 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) | 18/07/2024, 1:55 PM | — | — | — | — | — | — | — | — | — | — | — |
| 33 | — | Form 2A10052023.pdf | 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) | 5/10/2023, 1:37 PM | — | — | — | — | — | — | — | — | — | — | — |
| 34 | — | Form 2A.pdf | 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) | 19/04/2024, 12:57 PM | — | — | — | — | — | — | — | — | — | — | — |
| 35 | — | 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (6).pdf | 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) | 8/05/2024, 12:46 PM | — | — | — | — | — | — | — | — | — | — | — |
| 36 | — | CERSAI_Search_Report.pdf | 1 CERSAI details | 1/07/2022, 3:24 PM | — | — | — | — | — | — | — | — | — | — | — |
| 37 | — | Sold unsold -Patki joshi vishwa ram Sneh12262022.pdf | 1 Disclosure of sold/ booked inventory | 26/12/2022, 5:59 PM | — | — | — | — | — | — | — | — | — | — | — |
| 38 | — | Discolsure of Sold Inventory (1) Patki Joshi.pdf | 2 Disclosure of sold/ booked inventory | 15/04/2023, 1:33 PM | — | — | — | — | — | — | — | — | — | — | — |
| 39 | — | Discolsure of Sold Inventory.pdf | 3 Disclosure of sold/ booked inventory | 27/04/2023, 12:12 PM | — | — | — | — | — | — | — | — | — | — | — |
| 40 | — | Sold Booked Inventory10052023.pdf | 4 Disclosure of sold/ booked inventory | 5/10/2023, 1:32 PM | — | — | — | — | — | — | — | — | — | — | — |
| 41 | — | Sold Inventory.pdf | 5 Disclosure of sold/ booked inventory | 6/01/2024, 5:09 PM | — | — | — | — | — | — | — | — | — | — | — |
| 42 | — | Sold Inventory.pdf | 6 Disclosure of sold/ booked inventory | 6/01/2024, 5:17 PM | — | — | — | — | — | — | — | — | — | — | — |
| 43 | — | Sold Inventory.pdf | 7 Disclosure of sold/ booked inventory | 19/04/2024, 12:58 PM | — | — | — | — | — | — | — | — | — | — | — |
| 44 | — | Sold Unsold Inventory.pdf | 8 Disclosure of sold/ booked inventory | 18/07/2024, 1:55 PM | — | — | — | — | — | — | — | — | — | — | — |
| 45 | — | Form 5 -2022-202310052023.pdf | 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) | 5/10/2023, 1:38 PM | — | — | — | — | — | — | — | — | — | — | — |
| 46 | — | Agreement To Sale changed.pdf | 1 Proforma of Allotment letter | 22/07/2022, 5:27 PM | — | — | — | — | — | — | — | — | — | — | — |
| 47 | — | Allottment Letter.pdf | 2 Proforma of Allotment letter | 22/07/2022, 5:27 PM | — | — | — | — | — | — | — | — | — | — | — |
| 48 | — | Bank Account Declaration - RERA.pdf | 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same | 3/08/2022, 5:48 PM | — | — | — | — | — | — | — | — | — | — | — |
| 49 | — | Deviation No - Allotment Letter.pdf | 1 Deviation Report with respect to Allotment letter | 22/07/2022, 5:28 PM | — | — | — | — | — | — | — | — | — | — | — |
| 50 | — | Deviation - Agreement to Sell.pdf | 1 Deviation Report with respect to model copy of Agreement | 22/07/2022, 5:27 PM | — | — | — | — | — | — | — | — | — | — | — |
Construction progress
Stage-wise completion % from MahaRERA filings (when disclosed).
Location & boundaries
The residential project is situated in the prime locality of Nagala Park, Kolhapur. The project is bounded by East by C.S. No. 249-36, West by 12 Meter Road, North by Plot No. 34 out of C.S. No. 249-A-1-27-1, and South by 18 Meter Road. The project CTS/Survey No. is Plot No. 35 out of C.S. No. 249/A/1/27/A/1. This project is located in the Kolhapur district, Kolhapur village, and offers a serene and peaceful living experience amidst the bustling city. The project's strategic location ensures easy access to amenities and connectivity.
Project professionals
| Serial No | Professional Name | Professional Type |
|---|---|---|
| 1 | Kshitija Vijay Patki | Architect |
| 2 | Mahesh Kumbhojkar | Engineer |
| 3 | Shirish Kulkarni | Engineer |
| 4 | Harmony Construction | Engineer |
| 5 | M S Godbole and Associates | Chartered Accountant |
| 6 | V D Bhavsar and Associates | Chartered Accountant |
Litigation
- Status
- No
Map
Open in MapsProject photos

Developer — Patki-Joshi Engineers and Contractors Pvt. Ltd.
Patki-Joshi Engineers and Contractors Pvt. Ltd. is a reputable and experienced building project developer based in Kolhapur, Maharashtra. As a registered member of CREDAI Maharashtra (Confederation of Real Estate Developers Associations of India) with membership number CREDAI-KOP/2000-01/25, the company has demonstrated a commitment to excellence in the construction industry. With a proven track record of successful projects, Patki-Joshi Engineers and Contractors Pvt. Ltd. has earned a reputation for reliability and quality. Partnering with Bank of Maharashtra, IFSC Code: MABH0001219, the company provides a reliable financial backing for its projects, ensuring timely completion and satisfaction of clients.
FAQs
What makes vishwa ram-sneh in kolhapur a great place to live?
vishwa ram-sneh in kolhapur offers a balanced mix of urban amenities and rural charm. With access to local schools, markets, and transportation, it is an ideal place for both families and professionals. The surrounding area provides natural beauty, making it a peaceful yet well-connected locality.
Where is the vishwa ram-sneh project located?
The vishwa ram-sneh project is located in kolhapur , Kolhapur, maharashtra. It is situated in a serene environment with easy access to major roads and surrounding areas.
How many apartments are available in the this project?
There are a total of 24 apartments in the project approved by Maharera, providing a comfortable living space for its residents
What is the total area of the vishwa ram-sneh project?
The total project area for vishwa ram-sneh is 1264.77 square meters. This expansive space offers plenty of room for Commercial plots and recreational areas.
What recreational space is available as per FSI?
The project offers 0 square meters of recreational space as per FSI, providing ample room for parks, sports, and leisure activities for residents.
Who is the developer behind the vishwa ram-sneh project?
The project is developed by patki-joshi engineers and contractors pvt. ltd., a well-known name in the real estate industry. They are a trusted developer, offering quality and timely delivery of Commercial and commercial spaces. The developer is registered under credai maharashtra (confederation of real estate developers associations of india), ensuring compliance with industry standards and regulations.
What bank is associated with the project?
Bank of Maharashtra is associated with the vishwa ram-sneh project. For home loan and financing options, ICICI Bank provides reliable services with IFSC Code MABH0001219.
MahaRERA registered project
P53000046648
Project details are available at maharera.mahaonline.gov.in under registered projects.
Compliance snapshot
- Last developer update on filing
- 7 Dec 2023
- Registered on
- 25 Aug 2022
- Last verified
- 2 Sep 2026
More in Nagala Park
- AMEY HI LIFE WING C & D
NAGALA PARK, Kolhapur · PR1151012500763 · AMEY ESTATES
- Gajanan Venkatesh Complex
Nagala Park, Kolhapur · P53000032352 · Vishal Developers
- PALLAVI COOPERATIVE HOUSING SOCIETY
NAGALA PARK, Kolhapur · P53000080500 · VARADLAXMI AND KAPADE DEVELOPERS
- RK S CHAYACHITRAKAR
NAGALA PARK, Kolhapur · P53000055481 · Radhe Krishna Artisans LLP
- KRYSTAL SQUARE
Nagala Park, Kolhapur · P53000029138 · RAYSONS CONSTRUCTIONS
- LOKNAGARI
NAGALA PARK, Kolhapur · P53000019345 · RAMSINA CONSTRUCTIONS THROUGH PROPRIETOR VIKESH ABHAYKUMAR OSWAL
- THE ENCLAVE
NAGALA PARK, Kolhapur · P53000055648 · IDEAL REALTY
- GRUHYOG
NAGALA PARK, Kolhapur · P53000001246 · PRAVINSINH JAYSINGRAO GHATGE